• Franklin Community

    mega menu image

    This is an editable field

    Read More
  • Inventing Our Future

    mega menu image

    The City of Franklin is boldly planning to ensure our great City captures the type of growth and economic development that will lead us into the future.

    Read More

2024 Municipal Paving Project

As part of the 2024 Municipal Paving Project the city will mill and repave Elaine Avenue from Victoria Drive to Judy Drive.  Some deteriorated curb will be replaced.  All the old catch basins will also be removed and replaced as part of the project.  Any required base repair will be completed prior to paving.  The bids will open on June 26.  Work will take place this fall.